Alt accounts that are also me:

  • 4.28K Posts
  • 11.5K Comments
Joined 2 years ago
cake
Cake day: June 10th, 2023

help-circle






















  • Starbase activities (2025-06-16):

    • Jun 15th cryo delivery tally. (ViX)
    • Build site: Gigabay foundation preparation and excavation continues. Bonus bird butt. (ViX)
    • Storage lockers are lifted in Megabay 2, likely destined for the work platforms surrounding S38. (ViX)
    • B16 hot staging adapter moves from Starfactory to Megabay 1, then briefly reemerges to allow access to a crew lift. (LabPadre, ViX 1, ViX 2, Starship Gazer, Beyer)
    • Massey’s: S36 aft flaps are deployed. (ViX)
    • Road is closed, the tank farm is active, S36 is venting. (NSF)
    • Propellant load begins. (LabPadre)
    • S36 performs a single-engine static fire, approximately six seconds in duration. (NSF, LabPadre, ViX, Starship Gazer, Gisler, NSF full livestream)
    • Launch site: The Pad 2 chopsticks rise part way up the tower, and the fourth water cooled manifold undergoes a test fit on the launch mount. (ViX 1, ViX 2, ViX 3)
    • Other: Killip shares thoughts on the S36 heatshield, and speculates on why smaller tiles are used in specific locations. (Killip)
    • Zack Golden still struggles to reconcile that the pad names are 1 and 2 rather than A and B, and brings supporting documentation to the contrary. (Golden 1, Golden 2)


















OSZAR »